14 Decembrie 2018   |   Radu Diaconu, Associate Partner, Radu și Asociații SPRL

Article written by Radu Diaconu, Associate Partner, Radu și Asociații SPRL, and published by The In-House Lawyer Magazine, Summer 2018, The Legal500 publication.

Radu Diaconu, Associate Partner, Radu si Asociatii SPRL

 
 
Summary: A considerable number of buildings in Romania operate without a fire safety permit. While this has been treated in the past as a minor issue, the Colectiv night club fire in 2015 changed both the approach of the authorities and public perception. Currently, M&A buyers are reluctant to acquire facilities that do not hold a fire safety permit. However, the regulatory risk is not as high as usually perceived and there are options to mitigate it without derailing an M&A deal.

The fire safety permit – a brief history

Fire safety has been regulated in Romania for several decades. However, supervision has been lax, so there was little concern if for production facilities or office buildings (or schools) were not issued a fire safety permit. Everything changed in October 2015, when 64 people died and 147 were injured as the Colectiv night club in Bucharest burned to ashes. The public outcry led to the resignation of the then prime minister and to a lasting change in the approach of the public and the authorities towards this matter.


The fire safety permitting process in Romania currently has two main steps: (i) the issue of a fire safety endorsement – in Romanian, aviz de securitate la incendiu (the endorsement); and (ii) the issue of the fire safety permit – in Romanian, autorizație de securitate la incendiu (the permit). Both documents are required mainly for various commercial facilities with a surface exceeding 600 sq. m, including factories and warehouses, office buildings, hotels, restaurants and theatres.

The endorsement is needed before the construction starts and its purpose is to set out how the works should be performed in order to comply with the relevant fire safety requirements, while the permit is needed after the construction completes, in order for the relevant business activity to be started and carried out.

If any changes occur after the permit is issued (e.g., the authorized building is modified, the destination of the building is changed or the fire safety requirements are increased as per new legislation), the permit is no longer effective and an updated one needs to be obtained. The beneficiary of the permit is obliged to ensure the continued fulfilment of the conditions on which the permit was issued.

If a permit is missing, the fire fighters may apply a fine of up to approximately €11,000 or may even suspend the activity for certain types of facilities.

How missing fire safety permits affect M&A transactions in Romania

Prudent buyers quickly identify the absence of a fire safety permit as a key issue when performing legal due diligence on a Romanian business. Production and storage facilities, office buildings, restaurants or hotels often do not hold a permit. Moreover, there is a significant number of instances where, although a permit had been obtained, the building was modified to accommodate for additional equipment or its use was changed (say, from production to warehousing).

Thus, a buyer usually asks the seller to obtain a permit (or to update the existing one). This usually takes the form of a condition precedent to closing. Sellers often argue that this will delay the process since additional works need to be performed and, especially, since the authorities tend to delay the process of issuing the permit by several months. Even if carrying out additional works to meet fire safety standards is not a problem, obtaining the permit in a reasonable amount of time usually is. Therefore, sellers understandably have a strong preference towards removing this condition precedent from the sale-purchase agreement.

In response, compliance-minded buyers tend to view such an approach as unacceptable, since no-one wants to buy a factory or an office building that might theoretically be shut down one day after closing because a basic regulatory document is missing. This approach led to the collapse of a significant number of M&A and real estate deals in Romania during the last two to three years.

Is this really a deal-breaker?

There is no doubt that the absence of a permit is an important issue and that it should be dealt with properly. However, dropping a deal because of this may be excessive. There are two reasons for this: (i) as a matter of law, only certain types of facilities can be shut down by the fire fighters; and (ii) as a matter of practice, only a very small number of buildings have been affected by the suspension of operations due to the absence of this permit.

As regards the first point, the law governing fire safety matters (i.e., the Fire Safety Law No 307/2006) provides that the authorities may enforce a shutdown if a permit is not available because of ‘material non-compliance with fire safety requirements as regards the endangering of life, affecting the stability of structural elements and limiting the propagation of smoke and fire within the edifice and the neighboring areas, based on criteria established via government decision’.

The government decision issued so far regarding the criteria for establishing material non-compliance with fire safety requirements (i.e., the Government Decision No. 915/2015) covers only the following types of buildings: (i) commercial (e.g., bars, restaurants, nightclubs, markets, shopping malls); (ii) cultural (e.g., theatres); and (iii) tourism (e.g., hotels). There is no government decision at this time referring to criteria for other types of buildings (e.g., industrial and storage facilities or office buildings). Moreover, in practice, the fire fighters do not enforce shutdowns for other types of buildings (than the three categories set out above), even if the Fire Safety Law No. 307/2006 would allow for such an action, because – at least for the time being – no specific criteria have been enacted for other types of facilities.

As a matter of practice, the statistics on Romania’s central fire safety authority website indicate the following:

•    Control activities in 2017 were reduced in number by 46% compared to 2016 (as a result of the reduction of the size of control departments within the fire safety authorities).
•    Sanctions applied in 2017 were 30% lower (in terms of total number) than    in 2016.
•    The size of the fines was reduced by 42% in 2017 (compared to 2016).   
•    Only four shutdowns were enforced in 2017 (compared to 14 in 2016).

The elements above show that, while the absence of a permit should not be treated lightly, the likelihood of the facility being shut down by the fire fighters is remote.

A view on alternative solutions


Instead of insisting on having the issue of the permit as a condition precedent in the sale-purchase agreement, buyers might consider other options, especially if the target facility is not a restaurant, a shopping mall, a hotel or a similar venue.

The sale-purchase agreement might provide, for instance, that the seller must perform the relevant fire safety works but does not also need to obtain the permit in order to reach closing. A specific indemnity (backed by an escrow amount) might apply if a fire occurs within a certain period after closing or if a fine is applied by the competent authority for the lack of a permit. Insurance policies specifically covering such events are also an option, provided the buyer is satisfied with the terms of the coverage.

Finally, a buyer might simply accept the risk that a permit is not available (as is still the case with 90% of schools in Romania, for instance), but start the remediation works immediately after closing. Such a decision – which ensures that the M&A deal gets through – should nonetheless be based on a thorough analysis and understanding of the case, both from a technical and a legal perspective.

Article written by Radu Diaconu, Associate Partner, Radu și Asociații SPRL, and published by The In-House Lawyer Magazine,  Summer 2018, The Legal500 publication.

Radu și Asociații SPRL is a Romanian law firm, part of the expanding EY Law global network, which has more than 2,100 lawyers and offices in 81 countries. In Romania, Radu și Asociații SPRL team currently comprises of 45 lawyers and offers both legal consultancy services (with a focus on company law, commercial law, M&A, financing, real estate, data protection and labor) and assistance and representation before the authorities and the Romanian and international courts of law. Our expertise has been constantly recognized by the market and international firm directories, such as Legal 500, PLC Which Lawyer or Chambers & Partners.
 
 

PNSA

 
 

ARTICOLE PE ACEEASI TEMA

ARTICOLE DE ACELASI AUTOR


 

Ascunde Reclama
 
 

POSTEAZA UN COMENTARIU


Nume *
Email (nu va fi publicat) *
Comentariu *
Cod de securitate*







* campuri obligatorii


Articol 177 / 2301
 

Ascunde Reclama
 
BREAKING NEWS
ESENTIAL
Echipa de Concurență de la Suciu Popa a asistat un client din energie în legătură cu o plângere la Consiliul Concurenței, determinând modificarea legislației în domeniu. Cum lucrează avocații din această practică și în ce proiecte sunt implicați
Autonom Services SA a finalizat cu succes plasarea unei emisiuni de obligațiuni în valoare de 20 mil. €. RTPR Allen&Overy a acordat asistență juridică
The Rohatyn Group investește în Amethyst Radiotherapy și preia controlul rețelei care are două centre de tratare a cancerului în România | Stratulat Albulescu a asistat fondul american, TZA a acordat consultanță rețelei. Ce avocați au coordonat echipele
Victorie obținută de Niculeasa Law Firm într-un dosar ce privea o creanță fiscală de aproximativ 25 mil. € | O nouă perspectivă juridică asupra raportului dintre penal și fiscal
Reff & Asociații își extinde echipa dedicată serviciilor financiar-bancare prin recrutarea Patriciei Enache
Alexandru Olănescu, asistent universitar doctorand, Univ. „Nicolae Titulescu”: În ultimii aproape 30 de ani am observat o degradare din ce în ce mai accentuată în domeniul eduațional. Învățamântul ar trebui restructurat încă din primii ani de școală
NNDKP a asistat Edenred în achiziționarea platformei Benefit Online
Mandate multe și variate cu componentă de Dreptul mediului în activitatea avocaților Suciu Popa. Cleopatra Leahu, Partener: În ultimul an ne-am implicat în trei proiecte semnificative, nu numai din perspectiva valorii investițiilor de mediu pe care le implică, ci și a gradului ridicat de complexitate tehnică și juridică și a caracterului de noutate pentru piața din România
LegiTeam: Junior LAWYER for Voicu & Filipescu
Allen & Overy, alături de finanțatori în achiziția grupului CME de către PPF. Poliana Gogu-Naum (Counsel) a coordonat echipa locală, supervizată de partenerul Alexandru Retevoescu
Employment | Proiectul în care avocații Dentons au avut cel mai mult de lucru a fost o investigație internă, urmată de o cercetare disciplinară a unor angajați implicați în scheme de fraudare a angajatorului. Tiberiu Csaki, Partener: În ultima perioadă, cele mai frecvente au fost mandatele de restructurare a forței de muncă
Echipa de litigii fiscale a RTPR Allen & Overy câștigă în primă instanță pentru un furnizor internațional de echipamente auto restituirea sumei de 1,5 milioane de Euro de la ANAF – DGAMC
 
Citeste pe SeeNews Digital Network
  • BizBanker

  • BizLeader

      in curand...
  • SeeNews

    in curand...