In the pursuit of suitable lands, pastures have entered the close attention of developers.

 
 
Romania has a high potential of renewable energy sources (RES) distributed on its entire territory. Nevertheless, when selecting the location of a E-RES generation project, multiple criteria must be used such as distance to the grid, availability of grid capacity, absence of technical or urbanism limitations.

In the pursuit of suitable lands, pastures have entered the close attention of developers.

Romania has more than 4 million pastures, many of which strategically located. However, the vast majority of Romanian pastures are extra murros land, which triggers the application of a very strict legal regime. The purpose thereof is to ensure that the total surface of pastures inventoried in July 2007 is not being diminished.

According to Government Emergency Ordinance no. 34/2013 on the organization, administration and operation of permanent pastures and for amending and supplementing the Land Law no. 18/1991 (Pastures Ordinance”), the pastures located extra murros may be used only for animal grazing and fodder production.

By exception, the extra murros pastures may be used for building specific types of constructions among which the E-RES generation capacities. Nevertheless, the development of E-RES projects on extra-murros pastures is subject to specific mandatory requirements that, in practice, prove to be deadlocks.  

According to Pastures Ordinance, such requirements are the following:

(i)              the E-RES projects must not affect the good exploitation of the pastures; and

(ii)           the developer must recover from the non-productive lands an area equal to that of the pasture which is removed from the agricultural circuit.

On one hand, the 2 conditions seem to overlap. We do not see the rationale for which the E-RES capacities should not affect the good exploitation of the pastures if a corresponding area of non-productive land is to be recovered to account for the respective pasture.

In addition, from a practical perspective, non-productive land is extremely hard to find. As result, considering the big surface of land needed for developing a solar project, the land recovering requirement ultimately makes ineffective the right to develop such projects on pastures.

A practical solution for ensuring the coexistence between solar projects and pastures is to install higher pillars that would allow animal grazing and fodder production under the panels. Under such a scenario, it should be sufficient to remove from agricultural circuit and, therefore, to recover from non-productive land only the area covered by specific segments of the photovoltaic park (such as pillars and transformer substation), as such would be the only area that becomes unexploitable as pasture.

Nevertheless, the above solution should be deemed acceptable by the Ministry of Agricultural and Rural Development, as such authority should favorably endorse the removal of the pastures from the agricultural circuit (for areas below 100 ha).

Another solution could come from a draft of law that is currently on the agenda of the Deputies Chamber. According to such draft, it is allowed to build E-RES projects on extra murros land, including pastures, to the extent not exceeding 50 ha. If such law is approved (and wording slightly clarified and corelated to existing legislation), not only that the harsh requirements imposed by Pastures Ordinance would no longer be applicable, but no PUZ would be needed for developing E-RES projects on extra murros pastures. Such would considerably speed up the development process.

While Romanian lawmaker and authorities continue to be puzzled by the “green pastures” – “green power projects” dilemma, more and more studies and countries support the development of agrivoltaic projects, and numerous such projects are being implemented worldwide. We can only hope for a favorable solution that would give a boost to E-RES development in Romania.  

 
 

PNSA

 
 

ARTICOLE PE ACEEASI TEMA

ARTICOLE DE ACELASI AUTOR


     

    Ascunde Reclama
     
     

    POSTEAZA UN COMENTARIU


    Nume *
    Email (nu va fi publicat) *
    Comentariu *
    Cod de securitate*







    * campuri obligatorii


    Articol 1264 / 4601
     

    Ascunde Reclama
     
    BREAKING NEWS
    ESENTIAL
    Patru firme de avocați, în proiectul prin care Banca Transilvania a finalizat cu succes cea mai mare emisiune de obligaţiuni AT 1 din Europa Centrală şi de Est
    Kinstellar a asistat Lidl în achiziția unui teren situat în incinta fostei platforme industriale Aversa din București. Victor Constantinescu (Partner) și Sandra Gheorghe (Senior Associate), în prim plan
    GNP obține o nouă soluție favorabilă definitivă la Înalta Curte de Casație și Justiție prin care a fost anulată o decizie de sancționare emisă de Consiliul Concurenței | Reper jurisprudențial care impune un standard de analiză mai riguros în litigiile de concurență
    PNSA asistă Rex Concepts în obținerea unor linii de finanțare de la Bank Pekao pentru dezvoltarea rețelelor Burger King și Popeyes | Echipa de proiect a fost coordonată de partenerul Silviu Stoica, alături de Ioana Lazăr (Senior Associate) și Crina Stan (Associate)
    Băncilă, Diaconu și Asociații a asistat asociații Mamaia Resort Hotels în vânzarea părților lor sociale către Steaua de Mare Hotels & Resorts
    Fiscalitate ̸ Litigii Fiscale - Practica de Taxe a Kinstellar funcționează ca un „hub” integrat între drept, fiscalitate și finanțe, ce conturează un parcurs procedural previzibil, din faza de control al documentelor până la soluțiile finale ale instanței. Clienții beneficiază de pregătire proactivă, probatoriu robust și o echipă calibrată pentru litigii sofisticate | De vorbă cu Theodor Artenie (Counsel) și Raluca Botea (Counsel) despre tendințele ultimului an, prevenție, timing și modul de lucru al unei echipe recunoscute de directoarele internaționale
    Schoenherr asistă Allianz-Țiriac Asigurări în vânzarea unei clădiri de birouri către Primavera Development. Echipa, coordonată de Mădălina Mitan (partner)
    Clifford Chance Badea a asistat Aukera Energy în obținerea unei finanțări de 60 mil. € pentru primul său proiect de stocare a energiei pe bază de baterii din România
    LegiTeam: GNP Guia Naghi and Partners — Corporate | M&A Associate (2–4 years)
    Primul pas real spre avocatura de business | În culisele programului de practică juridică organizat de Țuca Zbârcea & Asociații, o adevărată școală de formare și începutul unui dialog profesional. Cursanții implicați în program au apreciat comunicarea continuă și proiectele în care au fost implicați și ar recomanda această experiență altor studenți. Avocații-mentori spun că experiența de practică autentică oferă prilejul de a înțelege care sunt valorile ce definesc profesia
    Clifford Chance Badea a asistat consorțiul de bănci de investiții în legătură cu emisiunea de obligațiuni de 600 milioane Euro lansată de DIGI România
    Cum arată, din interior, practica de Concurență de la 360Competition într-un an cu FDI intens, investigații tot mai tehnice și o presiune procedurală care schimbă regulile jocului | De vorba cu Adrian Șter (Managing Partner) despre axele de lucru care definesc practica, evaluarea corectă a riscului şi „linia de apărare” oferită clienţilor. Modelul senior-led bazat pe echipe compacte, rapiditate în decizii şi claritate în recomandări, arată de ce un boutique specializat e chemat frecvent acolo unde mandatele devin prea complicate pentru abordări standard
     
    Citeste pe SeeNews Digital Network
    • BizBanker

    • BizLeader

        in curand...
    • SeeNews

      in curand...